Projects | All projects
Sort by:year square footage
«
1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19
»
Puma Canada 2005  |  110,500 sf
Contract delivery :
Design Build Mechanical, Fixed Price
New Canadian head quarters for Puma including 20,500 sq. ft. of offices and a 90,000 sq. ft. warehouse. The warehouse includes 14 loading docks and 2 drive-in doors. The offices include a high-end showroom, a long span architectural stair and open mezzanine for the lobby area. The entire project was completed in just 3 and a half months.
Transit 2021  |  110,000 sq.ft.
Contract delivery :
This 110,000 square feet warehouse for Transit, automobile parts supplier, includes 10,000 square feet of offices. The construction's innovative approach includes using geothermal energy to supply the entirety of the heating and cooling system as well as a fully automated warehouse. The total warehouse capacity will be tripled by adding 110,000 square feet to the exiting 50,000 square feet.
Dubord and Rainville 2002  |  103,000 sf
Contract delivery :
Fixed Price
Head office for freezer and dry goods warehouse facility. Building included 25,000 sf of freezer space, 5,000 sf of refrigerated space, 32'-0" clear structure, interior loading docks and 9,000 sf of finished offices.
Innes Center 2002  |  102,000 sf
Contract delivery :
This 102,000 square feet regional shopping center in Ottawa, Ontario, Canada, included the construction of 3 retail pavilions and full site development with shared services for big box retailers. The scope of work for this project includes widening of Innes Rd. and installation of new traffic lights.
Pfizer 1999, 2002  |  100,000 sf
Contract delivery :
Construction Management
Construction activities at Pfizer's Canadian head offices wereperformed in phases, without interruption at any time to the office environment. The first phase, totaling 75,000 sf of new construction and completed in 1999, consisted of 3 new office levels including one level below grade with a 3 storey atrium including a large skylight. In 2001 Reliance was retained to add a 25,000 sf4th storey above the 1999 office building including a new skylight. The last phase, completed in 2002, involved the renovation of the reception area, drop-off area and new landscaping; the office remained in full operation during the expansion.
Target - 8 Stores 2013  |  Average 100,000 sf
Contract delivery :
Construction Management
As part of Target's entrance into Canada and the opening of 125 new stores, Target interviewed and pre-selected Reliance as one of it's 11 general contractors across Canada to convert existing Zellers stores to Target's standards. Reliance's work involved stores in Quebec and Ontario and included everything from new facades, to structural work, including seismic upgrades and complete new interiors beyond shell. Reliance complied with a rigorous 16 week schedule mandated by Target for their conversions.
Le Se7t 2021  |  100,000 sq.ft.
Contract delivery :
Construction Management
Le SE7T Phase II in Griffintown is designed to offer the best of Montreal's urban lifestyle and consists of 109 condos over 7 storeys, hence its name. Situated near the Lachine Canal bikeway and a few blocks away from the Atwater market, Le Sep7t is equipped with all trendy aspects of living in Montreal’s vital downtown neighbourhood. This encompasses street level restaurants, cafés and terraces, and the building itself includes a fitness facility, an outdoor pool, bicycle racks, and so much more.

Mitec 1999  |  95,000 sf
Contract delivery :
Design Build, Fixed Price
Mitec Telecom’s head office, production facility and distribution center totaling 95,000 square feet, includes a full working cafeteria, 20,000 square feet of offices, and a fully air-conditioned 60,000 square foot production area complete with its anti-static floor covering, burn-in and refrigeration test chambers and 100 foot candle lighting levels.
Itech 2000  |  92,000 sf
Contract delivery :
Design Build, Fixed Price
A92,000 sf head office for sports equipment manufacturer, including 25,000 sf of finished offices, separate production and testing areas and finished showroom space.
SF Marketing 2005  |  90,000 sf
Contract delivery :
Design Build Mechanical, Fixed Price
New offices, distribution center and production facility for a high end audio and sound equipment distributor. The building includes a humidity controlled warehouse area and repair room for guitar storage and repair, production areas, 20,000 square feet of finished offices and a 2 storey acoustically treated showroom for high-end speaker and amplifier demonstrations.
«
1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19
»