Zellers 1993 - 2000  |  12 stores total sf approx. 120,000
Contract delivery :
Design Build, Fixed Price
Reliance worked with the Zeller’s parent company – The Hudson’s Bay Company which is the oldest company in North America;to build three new stores and enlarge and renovate a total of nine existing Zellers stores throughout Quebec. Acting as team leader, Reliance directed logistics and design professionals in order to ensure that existing Zellers retail stores remained operational throughout the entire construction process.
Private Jet Hangar -- Whitewind 2000  |  35,000 sf
Contract delivery :
The design and construction of this private jet hanger completed by Reliance is capable of fitting two Global Express aircraft or one larger Boeing aircraft. Fire suppression requirements mandated the construction of an independent 250,000 US gallon underfloor storage water reservoir. Clearance for airplanes required a 50'-0" high clear steel structure and a 150'-0" by 45'-0" high motorized door complete with heated tracks and heated exterior concrete apron.
Montreal Forum / Pepsi Forum 2000  |  560,000 sf
Contract delivery :
Fixed Price
The Forum, former home to the world famous Montreal Canadiens hockey team, had been empty for years. Rather than demolish the vacant building, Canderel and its partners, the Simon Property Group, DLJ Real Estate and Madison Marquette undertook the challenge of redevelopment, uniting the building's history and future to create a one-of-a-kind, modern entertainment venue, including movie theaters, restaurants and retail space at a cost of approximately 100 million dollars. The existing roof was raised 18'-0" to increase retail space and accommodate a 65'-0" IMAX screen, 3 levels of underground parking, 22 AMC movie theaters, a 3-storey restaurant/bar and smaller retail tenant spaces. The Forum remains one of Montreal's most recognizable landmarks.
Mobilia Head Office and Warehouse 2000  |  90,000 sf
Contract delivery :
Construction Management, Design Build Mechanical
A 90,000 sf head office and warehousing facility for The Mobilia Furniture Store chain. Concrete slab met extremely stringent tolerances to allow for computer warehouse racking systems.
Itech 2000  |  92,000 sf
Contract delivery :
Design Build, Fixed Price
A92,000 sf head office for sports equipment manufacturer, including 25,000 sf of finished offices, separate production and testing areas and finished showroom space.
Eaton's - Rideau Center 2000  |  250,000 sf
Contract delivery :
Construction Management
Transformation of old 250,000 s.f. Eaton's premises to upgraded Eaton Retail Store for Sears Canada including all new fixtures, concessions and interior fit-up. Job was contracted on a fast-track basis and completed in 3 months. The total cost of renovation was $12,500,000.
Club Marin III 2000  |  350,000 sf
Contract delivery :
Fixed Price
This 24 storey complex is a $18,600,000 development that consists of a sports complex, underground parking and main lobby. Reliance's responsibilities included the core and shell of the building including all mechanical systems. The work was completed in 18 months, within budget and ahead of schedule.
Avmor 2000  |  72,000 sf
Contract delivery :
A72,000 sf extension to existing building including 30,000 sf of head office fit-up and 42'-0" clear distribution center. New office mezzanines were constructed over existing interior loading docks, without impeding normal business operations. A400'-0" long, 12'-0" high snow shelf was constructedon the roof of the existing building to compensate for large difference in the heights of the two buildings.
National Headquarters Canada Post Corporation 1993  |  800,000 sf
Contract delivery :
Canada Post’s $80,000,000 headquarters, located in Ottawa, Ontario, Canada, features 800,000 square feet of office space in two ten story towers, a separate, above-ground parking facility for 950 cars and a space-age network control centre (see Advanced Technology Section – Canada Post Control Center). Undertaken on a fast-track basis for the developer, Standard Life, the project was completed in just sixteen months – six months ahead of schedule. It has won multiple awards for energy efficiency and architectural design and was the feature on the Canadian postal 38 cent stamp for most of 2002 and 2003.
Mitec 1999  |  95,000 sf
Contract delivery :
Design Build, Fixed Price
Mitec Telecom’s head office, production facility and distribution center totaling 95,000 square feet, includes a full working cafeteria, 20,000 square feet of offices, and a fully air-conditioned 60,000 square foot production area complete with its anti-static floor covering, burn-in and refrigeration test chambers and 100 foot candle lighting levels.
«