Projects | All projects
Sort by:year square footage
«
1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19
»
Kraft Foods 2005  |  530,000 sf
Contract delivery :
Construction Management
This is a new distribution and product mixing center for Kraft Canada. All products manufactured within 100 km of Montreal are shipped directly to this facility for eventual distribution across North America. Total building size is 530,000 square feet, 30'-0" clear, including 50'-0" bays, with refrigerated and air conditioned warehouse areas. The project was designed and built in a period of less than 8 months. As a result of the weak clay soils available, piled foundations and a drained construction platform with overbuilt access roads were required. Site logistics and the construction schedule were further complicated by the fact that the foundation work occurred in the early spring season. The slab design allows for heavy floor loading and includes features such as non-corrosive metallic hardener, special floor sealers and fully filled sawcuts. The shipping and receiving docks consist of continuous depressed trenches with vertical lift levelers, with all dock equipment, overhead doors, and dock lifts fully automated and integrally connected.
La Marquise 2005  |  331,000 sf
Contract delivery :
Construction Management
A 13 storey condominium development consisting of 104,000 sf of below grade parking, lobby and health complex including a swimming pool and 227,000 sf of finished luxury condo units. Reliance was responsible for a complete turn-key project, including core and shell, all mechanical systems and fit up of all 113 units according to the individual owner's requirements.
Lowney's Phase I 2005  |  70,000 sf
Contract delivery :
Construction Management
Conversion and restoration of the 1902 Lowney’s wood structure chocolate factory (two buildings) to accommodate a new 110 unit condo development. Phase I of the development includes 1 floor of underground parking, exposed wood beams within each unit, a rooftop terrace complete with swimming pool, and contemporary finishes.
Paris Star Lofts 2005  |  175,000 sf
Contract delivery :
Construction Management
This 6 storey, 84 unit condo conversion from a former dye factory in Montreal's Plateau Mont-Royal district included the complete stripping ofthe building to its bare structure fora new facade of precast, balconies, brick and floor to ceiling windows. The "loft" unit concept includes european kitchens, 12'-0" exposed concrete ceilings, and high end finishes.
Puma Canada 2005  |  110,500 sf
Contract delivery :
Design Build Mechanical, Fixed Price
New Canadian head quarters for Puma including 20,500 sq. ft. of offices and a 90,000 sq. ft. warehouse. The warehouse includes 14 loading docks and 2 drive-in doors. The offices include a high-end showroom, a long span architectural stair and open mezzanine for the lobby area. The entire project was completed in just 3 and a half months.
SF Marketing 2005  |  90,000 sf
Contract delivery :
Design Build Mechanical, Fixed Price
New offices, distribution center and production facility for a high end audio and sound equipment distributor. The building includes a humidity controlled warehouse area and repair room for guitar storage and repair, production areas, 20,000 square feet of finished offices and a 2 storey acoustically treated showroom for high-end speaker and amplifier demonstrations.
Spinelli Honda 2005  |  26,000 sf
Contract delivery :
Design Build Mechanical, Fixed Price
This 26,000 square foot dealership complete with 12 service bays, sales area, drive-through area and administrative offices.
Spinelli Lexus 2005  |  23,500 sf
Contract delivery :
Design Build Mechanical, Fixed Price
This project entailed the renovation to an existing building and conversion to a new Lexus Dealership, including 14 service bays, drive-through areas, wash bays and administrative offices.
4220 Innes - Buildings F&J 2006  |  2 buildings, totaling 136,360 sf
Contract delivery :
Construction Management, Design Build
This project consisted of two retail anchor buildings, totaling 136,360 square feet, within a regional “Big Box” retail shopping Center in Ottawa, Ontario, Canada. Building ‘J’ is a multi-tenant 20,000 square foot retail building that was constructed for tenants such as Second Cup and Pier 1 Imports. Building ‘F’ was designed as a big box, multi-tenant retail comprising 116,360 square feet of gross construction, custom tailored to the individual specifications of the four more prominent retailers – Winners / Home Sense, Linen ‘N’ Things, Michael’s and the LCBO.
Acura 2006  |  15,000 sf
Contract delivery :
Design Build Mechanical, Fixed Price
An existing industrial building was renovated and partly demolished to allow for a curtain wall façade with aluminum and gravel panel inserts, in order to accommodate a car dealership. Major modifications to the concrete structure were required in order to build the new main entrance and the new drive through. The interior was transformed into a 10,000 sf tiled showroom with an interior drive-in of 5,000 sf separated by a glass wall from the show room. Other areas included new sales offices and service bays.
«
1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19
»