![]() |
Projects | Hospitality and Residential |
![]() |
Aura, 2014, 1,695,000 sf
Location :
Contract Delivery : During construction, a temporary loading dock access ramp was built to be in operation 24 hours a day while a permanent steel bridge was constructed through the site using top-down construction methods. Not only is Aura one of the first fully sprinklered residential building in Toronto, but it also includes individual water source heat pumps for each unit. |