| 
             
            Velan, 1995, 1999, 2009, 225,000 sf             
            
                Location :  
                St. Laurent, Quebec
             
                        
                Contract Delivery :  
                
             
            Originally built in 1995, this valve production facility, fit with overhead and jib crane installations, was expanded in 1999 and more recently in 2009.  The 2009 extension was a 50,000 sf added on to the existing warehouse and included construction of a new adjoining fabrication plant.  It includes offices on 2 floors totaling 20,000 sf. The specifications of the specialized production areas required unique installations in electrical, HVAC and fire protection, which were all incorporated into the design and final product.         |