Projects | Industrial Buildings

We build warehouses, distribution centers, cold storage facilities, transportation/logistics facilities, heavy industry factories and foundries for a variety of industrial clients, ranging from manufacturers of consumer products through to metals recyclers. The volume of industrial construction we do – amounting to some two hundred buildings over the past decade and generating over two million square feet of new industrial space every year – places Reliance among the top contractors in North America in this market.

Recently, given the scarcity of new land in developing metropolises and the constant increasing volume of imports from the far east, the redevelopment and modernization of existing industrial facilities and brown sites to today’s marketable standards, has become a niche market in which we have excelled.

Sort by:year square footage
«
1 - 2 - 3 - 4 - 5
»
Karmin Industries 2004  |  90,000 sf
Contract delivery :
Design Build, Fixed Price
Office and warehousing facility.
Mobilia Head Office and Warehouse 2000  |  90,000 sf
Contract delivery :
Construction Management, Design Build Mechanical
A 90,000 sf head office and warehousing facility for The Mobilia Furniture Store chain. Concrete slab met extremely stringent tolerances to allow for computer warehouse racking systems.
Itech 2000  |  92,000 sf
Contract delivery :
Design Build, Fixed Price
A92,000 sf head office for sports equipment manufacturer, including 25,000 sf of finished offices, separate production and testing areas and finished showroom space.
Dubord and Rainville 2002  |  103,000 sf
Contract delivery :
Fixed Price
Head office for freezer and dry goods warehouse facility. Building included 25,000 sf of freezer space, 5,000 sf of refrigerated space, 32'-0" clear structure, interior loading docks and 9,000 sf of finished offices.
Transit 2021  |  110,000 sq.ft.
Contract delivery :
This 110,000 square feet warehouse for Transit, automobile parts supplier, includes 10,000 square feet of offices. The construction's innovative approach includes using geothermal energy to supply the entirety of the heating and cooling system as well as a fully automated warehouse. The total warehouse capacity will be tripled by adding 110,000 square feet to the exiting 50,000 square feet.
Puma Canada 2005  |  110,500 sf
Contract delivery :
Design Build Mechanical, Fixed Price
New Canadian head quarters for Puma including 20,500 sq. ft. of offices and a 90,000 sq. ft. warehouse. The warehouse includes 14 loading docks and 2 drive-in doors. The offices include a high-end showroom, a long span architectural stair and open mezzanine for the lobby area. The entire project was completed in just 3 and a half months.
Tyco 2007  |  121,000 sf
Contract delivery :
Design Build, Fixed Price
Warehouse built with 32'-0" clear structure, including 15 hydraulic loading docks, one drive-in dock and one compactor door. Also included in the building is 7,200 SF of office and the possibility of accomodating a second floor.
19700 Clark Graham 2008  |  125,000 sq.ft
Contract delivery :
Design Build, Fixed Price
Construction of a two storey industrial facility including 13,000 sf of office space and 112,000 sf of 32' 0" clear warehouse space. Project was built for the possibility of a future expansion of 149,000 sf. The building includes 12 loading docks and one garage door as well as a slab on grade capable of supporting heavy loads. The building is equipped with ESFR sprinkler system and is built with access to railroad.
Browns Shoes 2014  |  131,500 sq.ft.
Contract delivery :
This fast-track office building and warehouse project achieved the LEED™ Silver certification. It consists of a poured concrete structure with retro plated floors including post-tensioned structural slabs, 2 storeys of high-end head office space with floor to ceiling glass, and three additional levels of office mezzanines, a 90,000 sq.ft. warehouse and indoor parking garage, and a 20’ by 30’ cantilevered executive conference room held up by post-tensioned beams located on the roof.


Conglom 2010  |  140,000 sf
Contract delivery :
Design Build Mechanical, Fixed Price
Only Reliance could envision the transformation of this waste site into a valuable and fuctional plot of land. The site originally contained 20' - 0" of unsuitable fill material, but Reliance formulated a soil re-engineering plan that eliminated the need to import any material. Completed in 2010, this two storey LEED building totals 140,000 sf of office and warehouse space. The warehouse is approximately 30' 0" clear and includes over eight loading docks.
«
1 - 2 - 3 - 4 - 5
»